The POP is where a network lives. We build them complete: site preparation and civils, the structure itself, power and earthing, racking, cable management and fibre termination, through to a commissioned site handed over ready for equipment.
These are small sites with a lot going on, and the quality of the build determines how easy the network is to work on for the next decade. Cramped racking and poor cable management turn every future job into a difficult one.
We build to the operator’s standard design or adapt to site constraints where the ideal layout doesn’t fit. Either way the site is handed over labelled, documented and photographed, with every termination tested.
A POP is the concentration point for everything downstream of it. Work done properly here means faster fault-finding, easier upgrades and fewer surprises when the site needs to grow.
How we build, power and commission a site, and what condition it’s handed over in.
Site preparation and civils, the structure, power and earthing, racking and cable management, fibre termination and commissioning. We hand over a site ready for your equipment.
Yes. Most operators have a standard POP specification and we build to it. Where a site's physical constraints make that impossible, we'll flag it during design rather than improvise on site.
Yes, including DC power infrastructure, earthing and bonding. Earthing in particular is worth getting right, because problems there surface as intermittent equipment faults that are difficult to trace back.
Yes. Adding racks, extending termination capacity or rebuilding cable management on a live site is routine, with the work planned around your outage windows.
It depends on the site, the structure type and access, but a straightforward build runs to weeks rather than months. We'll give you a programme once we've surveyed the site.
A commissioned site with labelled racking, termination records, test results and photographic documentation, plus as-builts reflecting what was actually installed rather than what was drawn.