Every fibre build starts on paper. Our design and engineering team surveys the route, resolves the obstacles before they become site problems, and produces a network design that reflects what’s actually on the ground rather than what the map suggests.
We handle wayleave applications with the relevant municipality or road authority, manage the approval process end to end, and deliver full GIS route mapping and as-built documentation. By the time crews mobilise, the route is approved and the design is signed off.
We start with a physical survey rather than a desktop study, because the difference between the two is where budgets get lost. From there we design the route, identify the crossings and obstructions that need special treatment, and take the approvals through to sign-off before any construction is scheduled.
Good design work removes risk from the build. It means fewer surprises on site, fewer redesigns after a rejected wayleave, and a route that can be maintained and extended later without rework.
How we survey, design and get routes approved, and what you can expect from the planning stage of a build.
Yes, end to end. We prepare the application, submit to the relevant municipality or road authority, and manage the process through to approval. You don't need to run a separate consultant for it.
It varies considerably by authority, and it's the stage most likely to move a project timeline. We'll tell you what to expect for your specific municipality based on what we've seen there, and we submit early so approvals aren't holding up mobilisation.
Physically. Desktop studies miss the things that cost money on site: services that aren't where the records say, access problems, ground conditions, crossings that need special treatment. We walk the route before we design it.
Full network design, GIS route mapping, and as-built documentation on completion. Everything is handed over in a format you can maintain and extend from, not just a set of drawings that made sense during construction.
Yes. Design and engineering is available as a standalone service, though most clients find it more efficient to keep design and construction with one team, since the designer is then accountable for whether the route actually builds.
Yes. If you already have a design, we'll review it against site conditions and flag anything that will cause problems during construction, then build to it or propose amendments.